For main contractors & consultants

Electrical & Waterproofing Subcontractor in Abu Dhabi

Two specialist packages from one licensed company, led on site by an electrical engineer, delivered with the submittals, test records and handover documents your project needs.

Request our prequalification pack

Packages we subcontract

Electrical works

  • Distribution boards: supply, installation and modification of DBs and SMDBs
  • Final circuits for lighting and small power, cable containment and earthing
  • Testing and certification of every new or modified circuit
  • DB-side provisions for KNX / DALI home-automation systems, with labelled demarcation for the automation specialist
Learn More →

Specialist waterproofing

  • Two-stage polyurethane injection for active leaks in basements, pump rooms, lift pits and tanks
  • Epoxy injection for structural crack repair
  • Liquid-applied systems for roofs, terraces, wet areas and pools, including spray polyurea
  • Potable-water tank and car-park deck systems
Learn More →

How we work on your site

01

An engineer on every package

Our founder, an electrical engineer, leads each package from submittal to handover. A site foreman runs the crew day to day, and crews are sized to your programme.

02

Approved before we start

Material submittals with technical and safety data sheets, plus a method statement and risk assessment, are issued for approval before mobilisation.

03

Inside your HSE system

Site induction for every worker, your permit-to-work and isolation procedures, lock-out / tag-out, daily toolbox talks, and incidents reported to your HSE team immediately.

04

Inspected at defined stages

An inspection and test plan with hold and witness points for your engineer, and signed test certificates before anything is covered or energised.

Documents you receive

  • Method statement and risk assessment
  • Material submittals with TDS and SDS
  • Inspection and test plan
  • Signed electrical test certificates
  • As-built DB schedules and single-line diagrams
  • Completion report and warranty

Credentials

Questions from contractors

Yes. Our prequalification pack covers company and licence details, vendor registrations, scope of services, key personnel, HSE and quality policies, inspection and test plans, and bank details, with the supporting documents attached. Ask for it through the contact form or WhatsApp.
Every package is led by Dot Expert's founder, an electrical engineer, who handles submittals, supervision, testing and handover. A foreman is appointed for each project, and the crew is sized to your programme.
Yes. We follow the main contractor's HSE plan, permit-to-work and isolation procedures on every site, and our project lead works directly with your safety coordinator.
Where the electrical work needs an approval from TAQA Distribution (formerly ADDC), the submission is made through a TAQA Distribution-licensed electrical contractor, and we prepare the drawings and test records and coordinate the inspection through to sign-off.
12 months on workmanship from handover, unless the subcontract specifies otherwise, plus the manufacturers' material warranties where they apply.

Add Dot Expert to your subcontractor list

Send us your prequalification form or ask for our pack — we reply with the documents and are available for a meeting or site visit.

Request our prequalification pack